How To Use And Maintain The Rail Grinding Machine
Instructions
1. Grinding machine installed GX160 small gasoline engine (motor), under normal circumstances generally pull rope 3 to 5 times to start. If you can not start, do not endlessly pull the starting rope, should be checked according to the contents of the gasoline engine failure and then start.
2. Gasoline engine to start under the circumstance of no load, the throttle into the minimum amount, the new gasoline engine should have run-in period. When the gasoline engine speed reaches 1500 ~ 2000r / min or more, the clutch can be engaged.
3. The Preparation of gasoline engine fuel must be strictly in accordance with the volume ratio of gasoline and oil is 20: 1. The new gasoline engine starts to use within 15 h, the fuel volume ratio is formulated at 15: 1.
4. Due to the larger dust of operation field,Do not operate in the absence of an air cleaner.
5.Each time, the feed rate of grinding machine should be moderate, usually in the range of 0.05 ~ 0.2mm, and to match the speed, when the speed is too large, it should be adjusted accordingly.
Maintenance
1. Gasoline engine speed has been adjusted at the factory, the speed limiter and the spring position can not be changed. If the change position is checked, it must be re-verified.
2. Gasoline engine speed control room for the fly cheap lubrication, each time when use 50h, must check the speed of the control room oil level.
3. Gasoline engine output shaft end of the oil seal after long-term use, due to tight seal can make the control room of lubricating oil leakage, so the use of 500h should be replaced.
4. Grinding machine vertical and horizontal screw to fill the oil lubrication.
©Shandong China Coal Import & Export Co., Ltd. © 2017
Address: No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Zhang Wen / Editor: Linda Zhang