a bath of side dumping mine cars were officially loaded after inspected by Shandong China Coal Group, and would be shipped to a large mine in Shangrao City, Jiangxi Province.
November 16th, a batch of mine car wheel sets of China Coal Group International Trade Company has passed the final inspection within the stipulated time, and would be transported to a big coal mine of
November 6th afternoon, 20 mine wagons of China Coal Group were formally loaded in the Group intelligent equipment workshop after inspection, and would be sent to a mine in Algeria.
Nov. 4 afternoon, Malaysian businessmen came to Shandong Coal Group to purchase steel rails, railway turnout, railway wrenches and other railway equipment and accessories.
October 25th, customers from Bolivia visited Shandong China Coal Group and took a on-site investigation about procurement of railway equipment and accessories.
October 12 afternoon, a batch of CKa Resin Adhesive Capsule manufactured by China Coal Group was ready to transport in the Group industrial park, and would be exported to Thailand.
©Shandong China Coal Import & Export Co., Ltd. © 2017
Address: No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Zhang Wen / Editor: Linda Zhang