On the morning of April 16, the 3rd First Member Representative Conference and 3rd General Election Conference of Jining Weishan Lake Development Promotion Association was held.
A batch of dowty retarder that were about to be scrapped were transported to the repair room of the retarder repair area in the comprehensive workshop of Xiangtangxi Station. The 49-year-old dowty ret
The Leaders Of Shandong High Speed Railway Construction Equipment Co., Ltd. To Visit China Coal Group
The operating system of the unmanned mine electric locomotives: the remote control center of the unmanned electric locomotive is equivalent to the cab of the electric locomotive.
On the morning of April 3, a batch of Curved rail side dump mine cars were loaded in the intelligent equipment manufacturing workshop of China Coal Group
The TDY203 short-type dowty retarder is made through careful design and practical experiments based on absorbing a large number of mature technologies. Features:
©Shandong China Coal Import & Export Co., Ltd. © 2017
Address: No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Zhang Wen / Editor: Linda Zhang