China Coal Group For Being Named The 2020 Shandong Province Leader Enterprise
We learned on the site that the maintenance of the dowty retarder at the station is very blind, although the Ministry of Railways has issued the "General Technical Standards for dowty retarder"
The test bench for testing the dowty retarder should meet the following requirements:
The vehicle for testing the dowty retarder should meet the following requirements:
The following are the basics about the mine wagon I hope you understand and master the details of the basic knowledge of instantaneous braking.
The dowty retarder detection device uses a digital servo control system (Figure 2), uses a single-chip closed-loop control to load and collect data, and uses a hydraulic device to simulate the force a
©Shandong China Coal Import & Export Co., Ltd. © 2017
Address: No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Zhang Wen / Editor: Linda Zhang